" Disclaimer: AlBabtain Group management considers the information contained in this document to be of confidential by nature and is a proprietary to AlBabtain Group. The distribution of this document should be controlled and be made available only to persons authorized by the CIO. No content of this document shall be copied, deconstructed or reproduced, except with a prior written approval from the Group IT management."
R | The person(s) who is/are RESPONSIBLE for the process |
A | The person(s) who is/are ACCOUNTABLE about the process |
C | The person(s) who is/are CONSULTED in the process |
I | The person(s) who is/are INFORMED about the process |
Roles | Job Title/ Role Name |
Role “1” | Release Coordinator |
Role ”2” | IT Administrator |
Procedure | Role “1” | Role “2” |
Release Management | ||
New hardware/ software to be released? | I | IC |
Approve ordering new items from vendor | I | I |
Receive the supplied items | RA | C |
Check for acceptance | RA | C |
Accepted? | RA | C |
Assign an appropriate administrator | RA | I |
Prepare back-out plan and update test report | IC | RA |
Implement the change in the production environment according to the IP | RC | A |
Implementation success? | RIC | A |
Execute Back-out Plan | RC | A |
Document the release and update CMDB | IC | RA |
Check the results and file the release documents | A | CA |
Send Release Documents to IT head | RA | - |
This document is intended for the internal use of AlBabtain Group and its subsidiaries only. Unauthorized usage or possession of this document in any form is strictly prohibited. The recipient should ensure that this document is not de-constructed, reproduced or circulated without prior approval from the document owner.